GFCIs and Extension Cords Toolbox Talk

Most shocks on a construction site don't come from the panel. They come from a cord that got run over, a tool with a bad ground, and a wet hand.

Standard: 29 CFR 1926.404(b)(1); 29 CFR 1926.405(a)(2)(ii)(J) and (g)(2)(iii); 29 CFR 1926.416(e)

Download free PDFFree · email once, then every PDF · print & run Collect crew signatures digitally

What's in the PDF

5-minute script

Plain-language talking points a foreman reads before the shift.

Discussion questions

Gets the crew talking about how this hazard shows up on YOUR site.

Sign-off sheet

Name/signature table — proof of training for the GC and OSHA. Or skip the printer and collect signatures on your phone.

After the talkNo signup
Lock It Out & Prove It Dead3 levelsFind every energy source in a telecom shelter, lock and tag it, prove it dead.Play

Beyond the talk

Need the certificate, not just the meeting?

Ground Fault Protection for Construction — online, self-paced, certificate the same day.

Get certified

More Electrical & Energy talks

← All 67 free toolbox talksWeek 33 in the 52-week safety meeting calendar