Rigging Plan Before the Lift Toolbox Talk
Most dropped loads on a tower were decided on the ground, before anyone climbed. Five minutes on the plan beats an hour of explaining what fell.
What's in the PDF
5-minute script
Plain-language talking points a foreman reads before the shift.
Discussion questions
Gets the crew talking about how this hazard shows up on YOUR site.
Sign-off sheet
Name/signature table — proof of training for the GC and OSHA. Or skip the printer and collect signatures on your phone.
After the talkNo signup
Crane Signal Simulator6 levelsLand a load with real hand signals — power line, blind pick, emergency stop.PlayBeyond the talk
Need the certificate, not just the meeting?
Basic Rigging Principles on Communication Structures — online, self-paced, certificate the same day.
More Telecom & Tower talks
← All 52 free toolbox talksWeek 35 in the 52-week safety meeting calendar