Rigging Plan Before the Lift Toolbox Talk

Most dropped loads on a tower were decided on the ground, before anyone climbed. Five minutes on the plan beats an hour of explaining what fell.

Download free PDFFree · email once, then every PDF · print & run Collect crew signatures digitally

What's in the PDF

5-minute script

Plain-language talking points a foreman reads before the shift.

Discussion questions

Gets the crew talking about how this hazard shows up on YOUR site.

Sign-off sheet

Name/signature table — proof of training for the GC and OSHA. Or skip the printer and collect signatures on your phone.

Test yourselfCrane Signal Person practice quiz10 questions, instant answers with the standard behind each. No signup.
After the talkNo signup
Crane Signal Simulator6 levelsLand a load with real hand signals — power line, blind pick, emergency stop.Play

Beyond the talk

Need the certificate, not just the meeting?

Basic Rigging Principles on Communication Structures — online, self-paced, certificate the same day.

Get certified

More Telecom & Tower talks

← All 52 free toolbox talksWeek 35 in the 52-week safety meeting calendar