Work Zone Traffic Safety Toolbox Talk

Fiber, utility and road crews work a few feet from traffic doing 45 mph or more, and some of those drivers are looking at a phone. Your setup is all that's between you.

Standard: 29 CFR 1926.201(a) and MUTCD Part 6; 29 CFR 1926.651(d)

Download free PDFFree · email once, then every PDF · print & run Collect crew signatures digitally

What's in the PDF

5-minute script

Plain-language talking points a foreman reads before the shift.

Discussion questions

Gets the crew talking about how this hazard shows up on YOUR site.

Sign-off sheet

Name/signature table — proof of training for the GC and OSHA. Or skip the printer and collect signatures on your phone.

More Fleet & Roadside talks

← All 52 free toolbox talksWeek 15 in the 52-week safety meeting calendar