rigging
How to Calculate Rigging Loads on a Cell Tower (A10.48 Plan Classes)
The four numbers an A10.48 tower rigging plan is built from — sling tension, block/gin-pole load, capstan pull and anchorage demand — with the real formulas and a free calculator to run them.
8 min read · Updated Oct 2026
















